Monday December 23rd, 2024 6:00PM

Hall County Landfill to close on June 1 for railroad work

By Hamilton Keener Anchor / Reporter

The Hall County Landfill will be closed on Saturday, Jun. 1 for essential work on the CSX railroad crossing at Oakbrook Drive. 

Hall County officials said the temporary closure is necessary to facilitate the safe and efficient maintenance of the railroad infrastructure.

Additionally, on Thursday, May 30 and Monday, Jun. 10 through Tuesday, Jun. 11 the Gould Lane Compactor Site will be closed for resurfacing.

All Hall County compactor sites will remain open for normal operation while the landfill is closed. 

Hall County compactor sites and their locations:

Balus Creek Compactor Site

3845 Old Flowery Branch Road, Oakwood, GA

Blackshear Place Compactor Site

2921 Atlanta Highway, Gainesville, GA

Candler Compactor Site

5064 Poplar Springs Road, Gainesville, GA

East Crescent Drive Compactor Site

738 East Crescent Drive, Gainesville, GA

Flowery Branch Compactor Site

4395 Falcon Parkway, Flowery Branch, GA

Gaines Ferry Compactor Site

6173 Gaines Ferry Road, Flowery Branch, GA

Gould Lane Compactor Site (closed for resurfacing May 30, June 10-11)

1277 Hillside Gardens Lane, Gainesville, GA

Lula Compactor Site

6176 Lula Road, Lula, GA

Murrayville Compactor Site

5117 Thompson Bridge Road, Murrayville, GA

Sardis Road Compactor Site

3166 Brackett Drive, Gainesville, GA

Tadmore Compactor Site

3320 Holly Springs Road, Gainesville, GA

Wauka Mountain Compactor Site

5880 Brookton-Lula Road, Gainesville, GA

  • Associated Categories: Homepage, Local/State News
  • Associated Tags: gainesville, hall county, construction, landfill, closed
© Copyright 2024 AccessWDUN.com
All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.