Monday August 11th, 2025 7:44AM
7:34AM ( 10 minutes ago ) Traffic Alert

GDOT survey work will stop traffic briefly in Dawsonville Sat. morning

By Staff
DAWSONVILLE - Georgia DOT says preliminary survey work will impact traffic briefly Saturday morning at the intersection of State Route 400 and State Route 53 in Dawsonville. <br /> <br /> Traffic on SR 400 will be stopped for up to 15 minutes as surveyors take shots of the area from 7 a.m. to noon. These stops will occur two or three times. Crews will start on SR 400 at 7 a.m. when there is least traffic on the road. Traffic on SR 53 will also be stopped two or three times before noon.<br /> <br /> The survey work is preliminary to the start of an $8.9 million project that will result in Georgia's first continuous flow intersection. (See earlier story. Link below.)<br /> <br /> If you would like to receive email updates on the project call Teri Pope at 770-718-3924 or email her at [email protected]
© Copyright 2025 AccessWDUN.com
All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.