Print

GDOT to close left lane for I-85 from Suwanee to Lawrenceville Road for maintenance

By AccessWDUN Staff
Posted 4:55PM on Monday 8th January 2024 ( 11 months ago )
Georgia Department of Transportation maintenance crews will close the left lane for I-85 both northbound and southbound directions from Suwanee to Lawrenceville Road to perform work on the concrete median. 
 
 The work will involve closure of the Peach Pass lanes at the 109.6 mile marker in both directions. On the northbound side, lane 2 will also be  closed while this activity is in process. 
 
The work will begin on Wednesday, January 10, 2024 beginning at 9 a.m. and continuing until 3 p.m. when the roadway will fully reopen. Maintenance will restart again on Thursday, January 11, 2024 from 9 a.m. until 3 p.m.
 
Georgia DOT advises  that exact dates may change due to weather or other factors. 
 
Motorists are asked to  reduce their speed while traveling through work zones, stay alert, and watch for workers.  
 
Divers can get real-time information on work status and traffic conditions by calling 511, visiting 511ga.org, or downloading the Georgia 511 app.

http://accesswdun.com/article/2024/1/1221994/gdot-to-close-left-lane-for-i-85-from-suwanee-to-lawrenceville-road-for-maintenance

© Copyright 2015 AccessNorthGa.com All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.