Print

Bridge work to cause travel delays on I-985 Southbound for midday Thursday

By Access WDUN Staff
Posted 2:00PM on Tuesday 19th September 2023 ( 1 year ago )

Bridge beam installation work will likely affect the late-morning and midday commute for Thursday between Oakwood and Gainesville.

GDOT officials say traffic pacing along I-985 southbound will take place by the Elachee Drive overpass between 10:00 a.m. and 2:00 p.m. Thursday, likely creating delays between Highways 60 and 53 and traffic congestion for the Exit 20 ramp onto I-985.

Officials expect added delays on these routes by the I-985 ramps, so allow for extra time during the midday hours. 

Before heading out, get real-time information on work status and traffic conditions by calling 511, visiting 511ga.org, or downloading the Georgia 511 app.

http://accesswdun.com/article/2023/9/1204991/bridge-work-to-cause-travel-delays-on-i-985-southbound-for-midday-thursday

© Copyright 2015 AccessNorthGa.com All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.