Print

GDOT open house set for bridge replacement project on Dawsonville Hwy. near Gainesville Marina

By B.J. Williams
Posted 3:11PM on Sunday 31st December 2017 ( 6 years ago )
The Georgia Department of Transportation (GDOT) has plans to replace the west side of the Dawsonville Highway Bridge over Lake Lanier near Gainesville Marina.
 
GDOT officials have scheduled an open house for Jan. 11, 2018 to show the plans to any interested members of the community. The open house will take place at Chestatee High School on Sardis Road from 5-7 p.m. 
 
The proposed project will cost an estimated $21.9 million, according to documents on the GDOT website.  If all goes as planned, acquisition of right of way for the project would get underway in 2019 and bridge construction would begin in 2020.
 
The plan calls for replacement of the two lanes on the west side of the bridge. 
The proposed project would replace the westbound side of the bridge with two lanes, according to GDOT documents.

http://accesswdun.com/article/2017/12/620345/gdot-open-house-set-for-bridge-replacement-project-on-dawsonville-hwy-near-gainesville-marina

© Copyright 2015 AccessNorthGa.com All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.