BRASELTON - Work is underway on a geothermal field being installed on the site of the future Northeast Georgia Medical Center (NGMC) in South Hall.
The geothermal well boring subcontractor mobilized on site the first week of June and drilling for over 150 wells began in early July. These 500-foot wells will circulate water to create renewable energy to heat and cool the future hospital.
To learn more about NGMC Braselton and this effort, visit www.nghs.com/braselton or call 770-219-3840.